Surface Point Installations

Hygienic wall cladding / Flooring / Self levelling

A sterile room is built in layers.

Fig. 01 / Same room, before and after Scroll to install
01What we do

Everything from the substrate up.

One crew takes the room from bare slab to finished system, so no part of it is somebody else's problem.

01

Hygienic wall cladding

Altro Whiterock and equivalent PVC systems. Welded seams, thermoformed corners, capping and trims, sealed around every penetration.

02

Commercial flooring

We install and are trained across a wide range of products, including safety flooring, sheet vinyl and welded floor systems. From carpet to rubber to coved vinyl, if it covers a floor we can lay it.

03

Self levelling and floor prep

Primed and poured flat, so the finish that goes on top has a solid, level foundation.

50+Years of combined installation experience
3Trades under one crew, from slab to finished system
1Point of responsibility for the whole room
A flat run of matte white hygienic wall cladding, its welded joints dressed flush.

The joint is the whole job.

Fig. 02 / Weld, dressed flush
02Sectors

We have been in rooms like yours.

Healthcare, food production, controlled environments, and plenty of rooms that fit no category at all. New builds, live renovations, and buildings that never closed for a day of it.

Swipe for more sectors

03Experience

Who you are hiring.

Manufacturers only stand behind their material when it goes on to spec and by their methods. We are trained and certified to that standard, and we take pride in finishing above it.

Install experience
More than 50 years combined
Qualifications
Altro trained and certified, and a Whiterock Elite Partner
Skills
Hygienic wall cladding, commercial flooring, self levelling floor preparation
Service area
Central Pennsylvania and surrounding
04Questions

How a job runs.

What do we need to price it?

A drawing set and a room list do most of the work. Send what you have and we will tell you what is missing.

Who do we work for?

Most often a flooring contractor. We also work for general contractors and facility managers, and directly with architects and designers.

What happens once it is awarded?

We help you get the quantities right before the material is ordered, build our install into your program and schedule, and put a foreman on site who keeps a constant line of communication between you and what is happening on your project.

05Next

Send us the project.

Drawings, a room list, or three lines about the space. We come back with a real answer, not a brochure.

Drop drawings here, or browse your files

Drawings, photographs, a schedule, or a zip of the lot

    Rather send it from your inbox? Email mark@surfacepoint.com.

    Got it. We will come back to you within one business day.

    Thanks for sending it over.

    Send us the project